South West & Wales

3 sites · 926,016 kWh · FY25/26

Sites

Absolute consumption is a function of size. The normalised columns are what make sites comparable — and they are the basis any site manager will challenge first.

SiteFormatEnergyCostkWh/m²kWh/cover
Cardiff Castle Streetcafe restaurant333,620£51,56311923.38
Bristol Harboursidecafe restaurant325,610£47,00310502.91
Bath Milsom Streetcafe restaurant266,785£38,09110463.05

Findings in South West & Wales

Ranked by severity, then by annual cost. Every figure links to the data behind it.

Cardiff Castle Street uses more than comparable sites

Cardiff Castle Street used 1.6 kWh per cover against a cafe_restaurant median of 1.2, a gap of 32%. The comparison is weather-adjusted and normalised by kWh per cover.

Compare plant, settings and opening hours against Birmingham Bullring.

CRITICALMedium confidence8.0 tCO2e/yrOpen evidence →q_05d6e701d02a3bef
£9,560per year

Overnight baseload creeping up at Bristol Harbourside

The minimum overnight load has risen from 4.52 kW to 5.77 kW over 12.0 months — about £3,289 a year if it continues. A steady climb like this usually means equipment degrading rather than a change in trading.

Inspect refrigeration seals, door heaters and any always-on plant at Bristol Harbourside.

HIGHHigh confidence2.7 tCO2e/yrOpen evidence →q_2284391f40b6f802
£3,289per year

Estimated readings at Bath Milsom Street

6% of readings for 2026-01-12 to 2026-02-22 are estimated rather than actual. These are excluded from baselines and flagged in the statutory report.

Ask the supplier for actual reads covering 2026-01-12 to 2026-02-22.

MEDIUMHigh confidenceOpen evidence →q_38321a28c74e210d
no cost impact