Leeds Briggate

cafe restaurant · North · 270 m² · 94,640 covers/yr
Open 7/7 days · typically 08:00–22:00

Consumption trend

March 2026 · half-hourly, with the overnight floor and occupied hours overlaid.

Active load Baseload (overnight floor) Occupied hours
01019kWh/interval1 Mar16 Mar31 Mar
Hover the chart for a half-hour's reading. Shaded bands are occupied hours; the dashed line is the overnight floor.

Monthly consumption

Electricity and gas over FY25/26.

Electricity Gas
0k19k38k040506070809101112010203
Hover a column for the month's split.

Half-hourly pattern

Every half-hour of the year. Horizontal banding low on the chart is overnight load that never switches off.

LowHigh (kWh per half-hour)
00:0006:0012:0018:0023:30AprMayJunJulAugSeptOctNovDecJanFebMar
Hover a cell for its value; each column is one day, each row a half-hour.

Findings at Leeds Briggate

Ranked by severity, then by annual cost. Every figure links to the data behind it.

Plant starts 2.5 hours before Leeds Briggate opens

Load ramps up at 05:30 but the site opens at 08:00, costing about £1,049 a year.

→ Trim the start time toward 07:30 and check whether the space still reaches temperature in time.

MEDIUMMedium confidence0.9 tCO2e/yrOpen evidence →q_7513928dc1785fdf
£1,049per year