North

4 sites · 1,079,788 kWh · FY25/26

Sites

Absolute consumption is a function of size. The normalised columns are what make sites comparable — and they are the basis any site manager will challenge first.

SiteFormatEnergyCostkWh/m²kWh/cover
Manchester Piccadillycafe restaurant350,788£51,33211503.07
Liverpool Albert Dockcafe restaurant309,664£43,67610683.04
Leeds Briggatecafe restaurant300,349£42,76211123.17
Manchester Dark Kitchenpart yeardark kitchen118,987£18,3566612.54

Findings in North

Ranked by severity, then by annual cost. Every figure links to the data behind it.

Step change in consumption at Manchester Piccadilly

Load rose by 261% on 2025-11-12 and has stayed there — about £10,689 a year. A persistent step usually means a setting changed or new equipment was installed.

Confirm what changed on or around 2025-11-12.

CRITICALHigh confidence8.9 tCO2e/yrOpen evidence →q_0c52349e110b04b0
£10,689per year

Plant starts 2.5 hours before Leeds Briggate opens

Load ramps up at 05:30 but the site opens at 08:00, costing about £1,049 a year.

Trim the start time toward 07:30 and check whether the space still reaches temperature in time.

MEDIUMMedium confidence0.9 tCO2e/yrOpen evidence →q_7513928dc1785fdf
£1,049per year